Below are some of the projects that the company ELEKTROINVEST has successfully completed in its 25 years in the Albanian market.

NumriTitulli
1 Repair of transformers for tourist emergencies for OSHEE sha
2 Implementation of repair service of power transformers TM / TU with power up to 1.8 MVA
3 SF6 220 kV Key Repair for Fierza HPP.
4 LTL 35 Kv power lines, 11 km to Starnik Hydro Power Plant, Prenjas
5 TL 35 Kv power line, 2 km to Sasaj Hydro Power Plant, Lukove.
6 TL 35 Kv power line, 6 km to Kavaja Water Treatment Plant.
7 TL 35 Kv power lines, 11 km for Starnik hydropower plant
8 Electric Substation 35/10/04 Kv for Kucova Water Supply
9 Construction of Electric Dajti Cable Car.
10 35 kV power lines together with 1250 kVA electrical cabinet for Fier Brick Factory..
11 Electromotor Repair for Cement Factory of Kruje Field with power up to 130 kW.
12 6 kV line construction for Borizane Cement Plant.
13 Repair of electric motors with different power up to 250 kW for Borizane Cement Plant.
13 Repair and production of Distribution Transformers up to 1000 kVA.
14 Reconstruction of substation 220/110 Kv Tirana.
15 Electric lines and cabins for Bovilla Water Supply.
16 KV Electric Cabs for the Electricity Branch of Tirana, Durres Fier, Pogradec, Elbasan.
17 Transformers and electric cabins and other accessories for ALBPETROL
18 Supply of 60 electric transformers KESH Power Corporation.
19 Block power supply in the aviation field of Tirana.
20 Construction and installation of 35 Kv electric cabs in Durres and Tirana
21 Pumping station assembly along with line and cab in Farke, Tirana
22 250 kW electromotor repairs for Tale Hydrovor.
23 90 kW Electromotor Repairs for Ballshin Water Supply.
24 Submersible pump repairs for Vora Water Supply.
25 10 kV line transmission for Copper Enrichment Plant in Fushe Arez, Beralb sha.
26 90 kW electromotor repair for submersible pumps for Arez Copper Enrichment Plant, Beralb sha.
27 400 kVA transformer repair for Tirana Sewerage.